Case Studies

Village Road Box Culvert Upgrade

Designing and developing new methods is something that really motivates us at TCD. This is exactly what we did when we were engaged by the City of Karratha to refurbish Bridge 1585 on Village Road, in the Burrup Peninsula.

The works involved sleeving the existing concrete box culvert sections with higher rated, smaller dimensional units, grouting of the annulus, reinstatement of the wing walls, repairs to the apron slabs and minor earthworks to upstream and downstream aprons.

Where a straightforward approach could have done the job, our civil and workshop employees saw an opportunity create a more efficient process by developing a jacking and sliding system to assist with the installation of the box culverts.

$614K

Client

City of Karratha

Location

Karratha, WA

Project Duration

1 Month

Project Start

April 2019

Project Finish

May 2019

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
CV006 Earthworks, Roadworks and Drainage

TCD were engaged by FMG to undertake the earthworks, roadworks and drainage for the construction of the new

PathLearn more
Vertical WHIMS Facility Upgrade – Bulk Earthworks

TCD were engaged by FMG to complete the Bulk Earthworks on Vertical WHIMS (Wet High Intensity Magnetic Sepa

PathLearn more
OPF2 Tails Line COS Bypass Construction

FMG’s Christmas Creek Mine required a 350m section of HDPE lined steel. The mine’s current OPF2 Tails L

PathLearn more
Path

Talk to our Civil Construction Experts

We’re a trusted partner for the civil mining and construction industry. Our civil construction contractors can make your next project a success.

Contact Us