Case Studies

Vertical WHIMS Facility Upgrade – Bulk Earthworks

TCD were engaged by FMG to complete the Bulk Earthworks on Vertical WHIMS (Wet High Intensity Magnetic Separation) Facility at their Christmas Creek Mine Site.

The scope of works included:

  • Construction of the WHIMS Building Pad, Concentrate Thickener Pad, belt Filter Pad, Screen Building Pad, two Switchroom Pads and crane pads.
  • Construction and modification of various access roads around the perimeter of the Vertical WHIMS Facility.
  • Construction and modification of various drainage systems, including the supply and installation of culverts and open drains.
  • Protection and relocation of existing services.
  • Blending of fill materials from three different source locations to meet the stringent fill material specification.
$2.8M

Client

FMG

Location

Pilbara, WA

Project Duration

3 months

Project Start

February 2020

Project Finish

April 2020

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
CV006 Earthworks, Roadworks and Drainage

TCD were engaged by FMG to undertake the earthworks, roadworks and drainage for the construction of the new

PathLearn more
Vertical WHIMS Facility Upgrade – Bulk Earthworks

TCD were engaged by FMG to complete the Bulk Earthworks on Vertical WHIMS (Wet High Intensity Magnetic Sepa

PathLearn more
OPF2 Tails Line COS Bypass Construction

FMG’s Christmas Creek Mine required a 350m section of HDPE lined steel. The mine’s current OPF2 Tails L

PathLearn more
Path

Talk to our Civil Construction Experts

We’re a trusted partner for the civil mining and construction industry. Our civil construction contractors can make your next project a success.

Contact Us