Solomon Mine Trinity Drive Overpass

FMG needed a heavy vehicle overpass to allow for the segregation of light and heavy vehicles on the existing Trinity Drive Access Road at their Solomon Mine.

We were engaged by long-time partners, NRW Civil and Mining, to install the multiplate corrugated steel tunnel. It was a true team effort to ensure the quality of the finished project, with NRW preparing the concrete footings. This was pivotal as it allowed us to ensure the first multiplate tunnel arches were installed in alignment.

It ensured the installation of the remaining panels was accurate and went smoothly. Nothing in these parts is small – the end result was an 81m tunnel, 7.2m high and 11.4m wide.

We’re proud to say that our experienced 12-man crew completed these high-risk works on time and without incident.

$600K

Client

NRW Civil and Mining

Location

Pilbara, WA

Project Duration

1 Month

Project Start

December 2015

Project Finish

January 2016

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
CV006 Earthworks, Roadworks and Drainage

TCD were engaged by FMG to undertake the earthworks, roadworks and drainage for the construction of the new

PathLearn more
Vertical WHIMS Facility Upgrade – Bulk Earthworks

TCD were engaged by FMG to complete the Bulk Earthworks on Vertical WHIMS (Wet High Intensity Magnetic Sepa

PathLearn more
OPF2 Tails Line COS Bypass Construction

FMG’s Christmas Creek Mine required a 350m section of HDPE lined steel. The mine’s current OPF2 Tails L

PathLearn more
Path

Talk to our Civil Construction Experts

We’re a trusted partner for the civil mining and construction industry. Our civil construction contractors can make your next project a success.

Contact Us