RGP5 Chichester Deviation Rail Culverts

TCD were engaged by NRW Civil and Mining as part of the BHP Billiton RGP5 South Duplication – Chichester Deviation Project

TCD’s subcontract package included the supply and install of corrugated steel pipe culverts. It was a big undertaking with a total cumulative length of over 4 kms in culverts, ranging in size from 600mm to 3,600mm in diameter. They’ve been built to last with the supply and placement of cement stabilised backfill and the placing of rock protection at the culvert locations.

$3.3M

Client

NRW Civil and Mining

Location

Pilbara, WA

Project Duration

10 Months

Project Start

April 2010

Project Finish

February 2011

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
CV006 Earthworks, Roadworks and Drainage

TCD were engaged by FMG to undertake the earthworks, roadworks and drainage for the construction of the new

PathLearn more
Vertical WHIMS Facility Upgrade – Bulk Earthworks

TCD were engaged by FMG to complete the Bulk Earthworks on Vertical WHIMS (Wet High Intensity Magnetic Sepa

PathLearn more
OPF2 Tails Line COS Bypass Construction

FMG’s Christmas Creek Mine required a 350m section of HDPE lined steel. The mine’s current OPF2 Tails L

PathLearn more
Path

Talk to our Civil Construction Experts

We’re a trusted partner for the civil mining and construction industry. Our civil construction contractors can make your next project a success.

Contact Us